Case Dossier 02 · Vibro-Acoustic Isolation

Floating Box-in-Box Mastering Room Above Bedrock Rail

Converting a ground-floor former printing workshop in Helsinki's Kallio district into a critical mastering room presented severe structure-borne vibration challenges: commuter metro bores pass through Precambrian granite directly beneath the courtyard, exciting building columns at 31.5 Hz and 40 Hz (`L_AFmax` 44 dB re-radiated prior to treatment).

1. Triaxial Accelerometer Baseline & Bearing Selection

Before pouring concrete, we logged 72 hours of triaxial ICP accelerometer spectra bolted directly to the existing foundation slab. To achieve >18 dB insertion loss at 31.5 Hz without risking resonance amplification at 16 Hz, the inner room's 140 mm reinforced concrete floating slab was cast on discrete cellular polyurethane elastomer pads tuned to a loaded vertical natural frequency of f_0 = 7.4 Hz.

2. Flush Monitor Soffits & Modal Bass Trapping

Inside the decoupled inner shell, left and right three-way main monitors sit flush-mounted in high-mass sand-filled masonry baffles angled at ±30°, eliminating speaker-boundary interference response (SBIR) cancellations between 65 Hz and 180 Hz. Rear-wall porous membrane absorbers (`650 mm` deep rockwool + limp-mass EPDM septum behind birch slats) hold low-frequency modal decay times (`T20` in 1/3-octave bands from 40 Hz to 160 Hz) tightly between 0.21 s and 0.27 s.

Verification Metric Design Target Commissioned Value
Peak Train Pass-By Noise (`LAeq,fast`) ≤ NR 18 (23 dBA) NR 14 (19.2 dBA)
Listening Position Sweet-Spot Flatness (35 Hz – 16 kHz) ±2.5 dB (1/6-oct) ±1.9 dB (no DSP EQ)
Early Reflection Free Zone (`ERFZ` ≤ -20 dB) ≥ 18 ms post-direct 21.4 ms post-direct